P/H posts July 1, 2015July 4, 2015 / wvhydro / Leave a comment Penstock coming into powerhouse hole. 6′ x 6′ footprint
P/H almost done July 1, 2015July 4, 2015 / wvhydro / Leave a comment Penstock & 1/2″ elec. conduit enter powerhouse, 6′ x 6′ footprint
Powerhouse from above July 1, 2015July 16, 2015 / wvhydro / Leave a comment Powerhouse from above looking down stream in fall
Powerhouse from up hill during high water in summer July 1, 2015July 16, 2015 / wvhydro / Leave a comment Powerhouse from uphill during high water in summer
P/H path steps July 1, 2015July 4, 2015 / wvhydro / Leave a comment Powerhouse path stairs. 8″ locust logs w/ treated plywood sides.
Discharge box cutouts July 1, 2015July 4, 2015 / wvhydro / Leave a comment Discharge box w/ two 4″ cutouts for return to creek.
Discharge box with pipes July 1, 2015July 4, 2015 / wvhydro / Leave a comment Discharge box w/ two 4″ pipes to creek
Manifold before bypass July 1, 2015July 4, 2015 / wvhydro / Leave a comment 4″ sch 40 w/ 2″ valves and braided hoses, before bypass between wyes.
Manifold before bypass, front July 1, 2015July 4, 2015 / wvhydro / Leave a comment Early manifold before bypass Early manifold, before bypass between wyes.
Bypass elbow July 1, 2015July 4, 2015 / wvhydro / Leave a comment Cutaway of discharge box. Two 4″ pipes back into creek.